Kseb Agreement Form

March 10, 2022

The duly completed application form with the accompanying persons and the required application fee may be handed over to the authorized official of the KSEB in the office of the electrical department or sent by registered mail to the assistant engineer of the electrical section concerned. Applicants for a weatherproof service connection that does not require phase addition, post-insertion, support point, etc. can transfer the deposit and delivery cost to standard rates as well as the application fee based on the data provided in the application form. In the case of other consumers, the request for transfer of the deposit and fees will be made by mail after the on-site inspection. After reviewing the matter, the Administrators authorized the Chief Engineer (Commercial and Tariff) to inform the Kerala State Electricity Regulatory Commission of the rule position, which prohibits separate agreements as well as necessary modern applications and amendments proposed in the Kerala Electricity Supply Code 2014 and the Tariff Ordinance. Green Channel for Ht/EHT ConsumersSimplified service connection request forms are available at the price of Rs 10/- at Electrical Sections. (The app format is available for download at the bottom of this page). Clause 4(10) of the Rules states that in the event that a contract is to be concluded between the distributor and the consumer, the consumer becomes part of the application form and no separate contract form is required and also prohibits separate agreements and provides that in cases where an agreement is required, it is part of the application. Currently, separate agreements exist only for demand-driven consumers. It is important to insist on demand-driven consumer agreements, as fixed-rate billing for these consumers is based on the “contractual demand” stated in the agreement. As soon as the agreement is waived, the concept of contractual demand, which is defined in the 2014 Supply Code, a critical billing parameter in the tariff regulation, must be modified in order to make the invoicing process legally sound.

Document prepared for KSEB Clause 4 Consent Request Form (10) The new service connection request must be made online or in the prescribed service connection request form; The same application form can be used to obtain a permanent/temporary service connection. New Low Voltage (LT) Service Connection Request Form August 25, 2021 | by TeamLease RegTech Legal Research Team. 6. Test certificate of the measuring device if the consumer provides it. Documents to be attached to the service connection request form 8. Consents / Approvals / Approvals wherever this is the case. The following documents must be submitted with the application. For more information, see 2014 Supply Code. 7. Certificate of eligibility for exemption from payment of the cost of providing a service connection, if applicable. 3.

Sketch with details of the connected equipment, marked in the construction plan. The Kerala State Electricity Board (KSEB) issued an order on 24 August 2021 to prepare the application form to include the agreement in clause 4 (10). .

Comments are closed.